User's Manual

Table Of Contents
120 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 5 - On-Line Commissioning
Table 5-2: Timeslots Needing Testing in BTS with More Than One TRX
TRX Number Timeslot Number Channel Type Testing Necessary
First TRX (Note) 0 BCCH No
1SDCCHNo
2TCHYes
3TCHYes
4TCHYes
5TCHYes
6TCHYes
7TCHYes
Second through
Sixth TRX (Note)
0TCHYes
1TCHYes
2TCHYes
3TCHYes
4TCHYes
5TCHYes
6TCHYes
7TCHYes
Note: The BCCH can be assigned to any TRX within the BTS. The label “First TRX”
applies to the TRX to which is assigned the BCCH. The
OMC operator may determine
which physical TRX is the “First” or beacon TRX. All TCH timeslots on the second
through sixth TRX must be tested.