User's Manual
Table Of Contents
- UltraWAVE Micro BTS Installation and Commissioning Guide
- Chapter 1 - Unpacking and Configuration Verification
- Chapter 2 - Installation
- 2.1 Analyzing Site Requirements
- 2.2 Mounting the Micro BTS Chassis
- 2.3 Configuring the E1 or T1 Trunk Card
- 2.4 Connecting Ground Cables
- 2.5 Connecting Power Supplies
- 2.6 Connecting E1 or T1 Trunk Cables
- 2.7 Connecting Antennas
- 2.8 Connecting External Alarms
- 2.9 Making a Serial Connection to the Processor Card
- 2.10 Network Connections
- 2.11 Post Installation Cabling and Checks
- Chapter 3 - Off-Line Commissioning
- 3.1 Pre Off-Line Commissioning
- 3.2 Off-Line Commissioning of the Micro BTS
- 3.2.1 Starting XWindows Using the Craft PC
- 3.2.2 Connecting the Craft PC to the ICP Processor Card
- 3.2.3 Setting Up a Serial Connection via the ICP Processor Card Serial Port
- 3.2.4 Power-On LED Tests
- 3.2.5 Configuring Boot Parameters
- 3.2.6 Setting Up an Ethernet Connection to the ICP Processor Card Ethernet Port
- 3.2.7 Verifying Telnet Communications with the Micro BTS over Ethernet
- 3.3 Software Verification using Craft PC
- 3.3.1 Verifying the Current Software Version and Patch Level
- 3.3.2 Checking the Flash Version Number
- 3.3.3 Running E1 or T1 POST Diagnostics
- 3.3.4 Running TRX POST Diagnostics
- 3.3.5 Reviewing POST Results
- 3.3.6 Rebooting the Micro BTS after Running POST
- 3.3.7 Terminating Serial Communications with the Micro BTS
- 3.3.8 Exiting XWindows on the Craft PC
- 3.4 Upgrading the Micro BTS Software Version (Flash)
- 3.5 Post Off-Line Commissioning
- Chapter 4 - Off-Line Commissioning of a Daisy Chain
- Chapter 5 - On-Line Commissioning
- Checklist 1 - Site Readiness Checklist
- Checklist 2 - Installation Checklist
- Checklist 3 - Commissioning Checklist
- Index
116 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 5 - On-Line Commissioning
5.2.1 Unlocking the Abis Interface
The Abis interface between the BSC and BTS is established via a PPP link over E1
or T1 lines. Make the E1 or T1 connections to the provider and set up the Abis
signaling link to the OMC as described in Chapter 4 - Off-Line Commissioning of a
Daisy Chain. Once the Abis link is established it must be unlocked at the OMC to
allow the BSC to download the TRX code to the BTS. Refer to the UltraVIEW OMC
Configuration Guide for procedures to unlock the Abis. As the code downloads,
the TRXs run POST to verify their operation. This takes up to fifteen minutes
depending the number of TRXs in the system.
Figure 5-2 illustrates the LED display during the POST process and Figure 5-3
illustrates the final LED display.
For systems equipped with multiple TRXs, the TRXs download
their code and run POST simultaneously. If viewing the output in
a serial window, the POST messages will be mixed among
different TRXs while in progress.
Figure 5-2: LED Display During POST
Figure 5-3: Final LED Display
Abis connection to BSC completes TRX code download to each
card sequentially. LED display during POST is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
OFF
OFF
TRX 1-6
N/A
N/A
N/A
IE144501
ON
ON
ON
OFF
FAST FLASH
ON
OFF
OFF
Abis connection to BSC completes TRX code download to each
card sequentially. After 10 minutes, the final LED display is:
ICP E1/T1LEDs
SCN
PWR
ON LINE
FLT
PORT 0
PORT 1
ON
ON
N/A
N/A
N/A
OFF
OFF
TRX 1-6
N/A
N/A
N/A
IE144502
ON
ON
ON
OFF
ON
OFF
OFF
/
ON or OFF*
* Note: TRX ON LINE will display ON if it is unlocked, or OFF if it is locked (in the OMC database).