Chapter 5 - On-Line Commissioning
In this Chapter:
“Pre On-Line Commissioning Requirements” on page 113
“On-Line Commissioning” on page 114
“Antenna Cabling and Power Verification” on page 121
“Post On-Line Commissioning Procedures” on page 129
On-line commissioning takes place on-site after installation and off-line
commissioning. Its purpose is to verify that the equipment is operational and can
be integrated into the telecommunications network.
On-line commissioning requires the participation of two people; a field technician
who operates and tests the Micro BTS on-site and an OMC operator who remains
at the OMC console. These two must work together, performing the procedures in
this chapter in conjunction with the procedures in the UltraVIEW OMC
Configuration Guide.