108 UltraWAVE Micro BTS Installation and Commissioning Guide, Version B
Chapter 4 - Off-Line Commissioning of a Daisy Chain
4.1 Prerequisites to Daisy Chaining
1 Ensure that all Micro BTSs comprising the daisy chain are installed and
off-line commissioned.
Refer to Chapter 2 - Installation and Chapter 3 - Off-Line Commissioning for
instructions on how to install and off-line commission the Micro BTSs that are
part of the daisy chain.
2 Ensure that the Abis Manager timeslot has been set for each Micro BTS in the
daisy chain as described in Section 4.2. Each Abis link within this daisy chain
MUST be allocated a unique Abis timeslot number.
3 Turn the power to all units off.
4 Using the instructions in Section 2.6.3, verify that all E1 and/or T1 lines are
in place and commissioned by the operator from the BSC to the first Micro
BTS, and between all successive Micro BTSs comprising the daisy chain.