4.21.5 Split Circuit
Pressing the “
L
” command from the Menu of Actions allows you to split the circuit through
the data test center equipment. New circuit information is added in the same way as with the
monitor circuit.
With the Split Circuit, the data test center splits the circuit and connects it to their equipment.
Unlike the Monitor test circuit, the Split test circuit is intrusive and all transmit and receive
data must pass through the equipment at the data test center.
Figure 4-56 shows the TADS screen with a split circuit completed. It uses two 64kbps time
slots (like the Monitor circuit). Figure 4-57 shows a diagram of the split test circuit.
Figure 4-56. TADS Screen with Split Circuits
Node_1 | C1 10161 CPU XCON COM 407535038 Ser 00101 | 12-31-99 14:33
page: 1 of 1
CIRCUIT ID FACILITY TEST EQUIPMENT TEST TYPE TC CNV
Jacksonville w1-1 01*64 spl w1-2 01*64 off d moos n/a
split ckt w1-1 01*64 off w2-1 01*64 off s/d moos n/a
split ckt w1-2 01*64 off w2-1 01*64 off s/d moos n/a
moNitor | spLit | Release | Tla | pgUp | pgDn | Main