User`s guide
Snap Server 730i and 750i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 730i or 750i, and indicates whether a component comes with the server or
must be supplied by the customer.
Componen
t Description
Network and
Power
;
Ethernet Cables (4 per enclosure)
Required to connect the Ethernet port(s) to the network.
;
Power Cables (6 per enclosure)
Required to plug into the mains (2 US, 2 UK, 2 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-based
APC-brand UPS. Visit the APC Web site for a listing of optimal APC
models.
Rack
;
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
Expansion
;
SAS Card
Required to connect to an S50 expansion array.