Installation guide
14 U41255-J-Z156-1-76
Configuring the 3200S RAID Controller Installation
Memory Installation
Important: Same cache size for both cluster RAID controllers!
Installing Battery Backup Module
The Battery Backup Module provides power to keep the cache memory
contents during a power outage.
Ê Attach the module to the controller, connecting P12 on the Battery Backup
Module to J12 on the controller.
Ê Install the Battery Backup Module mounting hardware provided with the
ABM-100 in the four holes adjacent to P12.
Ê Attach the ABM-100 Battery stability bracket in the holes using the hardware
provided.
Installing Battery Backup Module
i