Operation Manual
EN
33
EN
BNE : 664Y6000 •D
MAINTENANCE
RESTART AFTER MAINTENANCE
Set-up conditions
• All removed components reinstalled
• All connections made
• Oil supply open
• DHW and heating circuits full of water
Procedure
1. Energize the appliance and switch it on.
2. Set the appliance at maximum power and check the absence of burned gas leaks.
3. Check the correct operation of the charging pump.
4. Check the oil pressure and CO
2
adjustment in accordance with procedure "Combustion
adjustment", page 28.
IN CASE OF PROBLEM...
In case of problem, please contact you ACV representative and provide the appliance part number
and serial number, written on the type plate.
Boiler Marking
Location: at the back of the appliance.
The part number (Code) and serial number (N°) of the appliance are written on the
type plate and must be provided to ACV in the case of a warranty claim. If they are not
provided, the warranty claim shall be void.