Operation Manual
EN
15
EN
BNE : 664Y6000 •D
INSTALLATION
HOW TO MOVE THE BOILER
Using a hand truck
•
Use a means of transport adapted to the boiler weight.
Minimum width of the door and the hall necessary to pass the boiler
C
B
A
D
A = maximum boiler width
B = maximum boiler length
C = Door width
D = Hall width
Door height = std
Hall width :
C =
A
x B
D
Example of calculation to determine the minimum hall width, with adoor width: D = 800 mm
C =
540
x 1000
= Hall width ≥ 675 mm
800
Door width:
D =
A
x B
C
Example of calculation to determine the minimum door width, with ahall width: D = 900 mm
D =
540
x 1000
= Hall width ≥ 600 mm
900