INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS ALFA Gaz G/GP Dual application gas boiler with atmospheric burner 05/11/2002 ACV reserves the right to modality the technical specifications and components of its products without prior notice.
INDEX 1 1 INTRODUCTION 2 1.1 1.2 1.3 1.4 Intended users of these instructions Symbols Applicable standards Warnings 2 2 2 2 2 INSTALLATION 3 2.1 2.2 2.3 Boiler room Connections Electrical connection 3 3 5 3 STARTUP 6 3.1 3.2 Filling the heating and hot water circuits Atmospheric burner troubleshooting 6 6 4 SERVICING 6 4.1 4.2 4.3 4.4 4.5 4.
2 2.1 INSTALLATION 2.2.2 BOILER ROOM 2.2.2.1 Examples of basic circuit configurations The drain valve and safety valve must be connected to the waste water system in accordance with current regulations. 2.1.1 ACCESSIBILITY The boiler room must be large enough to allow good access to boiler. The following minimum distances (mm) are required around the boiler: - front - rear 500 150 - sides - above CENTRAL HEATING CONNECTION 100 700 9 2.1.
2 INSTALLATION 2.2.2.2 ACV circulation kit ACV offers an optional pre-assembled circulation kit comprising: - a circulator. - a 3-way manual motorisable valve. - connecting pipes including a second optional circuit. - two isolating valves. - adapters for mounting expansion tank, safety valve and filling valve to right or left. 2.2.2.3 Discharge The drain valve and safety valve must be connected to the waste water system in accordance with current regulations. 2.2.3 Fig.
2 2.2.4 INSTALLATION CONTROLLER KITS KIT 1: ACV 13.00 / Basic Basic kit for regulating flow temperature according to weather conditions. It comprises: temperature regulator with analogue timer, water temperature detector (-30/130° C), outside temperature detector (-30/50° C), 230V - 3 spindle servomotor SQY 31 and intermediate socket. Fig. 6a: kit 1 KIT 1: ACV 13.00 / Standard Basic kit for regulating flow temperature according to weather conditions.
3 3.1 START-UP FILLING THE HEATING AND HOT WATER CIRCUITS 1. Fill the domestic hot water circuit and bring it up to pressure. 4 4.1 RECOMMENDATION ACV recommends that boilers should be serviced at least once a year. The burner must be serviced and tested by a competent engineer. 4.2 IMPORTANT The hot water tank must be pressurised before the heating circuit is filled. 2. Fill the heating circuit taking care not to exceed the 2 bar pressure limit. 3. Vent the air from the top of the boiler. 4.
4 4.4 SERVICING SERVICING THE BURNER - Check and clean the burner and ignition electrode. - Check that the safety components are working properly. 4.5 EMPTYING THE BOILER 4.5.1 EMPTYING THE PRIMARY CIRCUIT (central heating): 1 1 1. Switch off the power to the boiler at the mains switch installed by the electrician. 2. Close the isolating valves (1) of the boiler system. 3. Connect a hose to the drain valve (2). Ensure that it is attached properly. 4.
5 5.1 • • • • • • • • • DESCRIPTION OVERVIEW Dual application boiler (central heating and domestic hot water). Designed for connection to a chimney or suitable flue. TANK-IN-TANK indirect storage type domestic hot water production. Fittings for connecting the circulation kit to feed the heating circuit (available as an option). Control panel with setting thermostat (60/90 °C), on/off switch, Summer/Winter selector, thermometer, warning lamp and burner reset button.
5 DESCRIPTION 23 Boiler components Fig. 15 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24.
6 6.
6 TECHNICAL SPECIFICATION Description 1. 2. 3. 4. These atmospheric burners are fitted with a SIT gas valve and an electrically operated relay. This gas valve has been specially developed for atmospheric burners with automatic ignition and ionisation flame detection. Electrically operated gas valves. Upstream gas pressure test point. Pressure regulator Gas burner pressure test point. 1 Advantage • • • No pilot flame, therefore no gas consumption when when the boiler is off.
7 USER GUIDE 7.1 USING THE BOILER 7.1.2 7.1.1 GETTING TO KNOW THE CONTROL PANEL (Fig. 20) Your system is fitted with a heating safety valve set to 3 bar, with a pressure gauge. Before doing any work on the boiler, switch off the power at the mains switch installed in the boiler room by the electrician. On the control panel, switch off the ON/OFF switch. Ensure that the water in the system is always pressurised.
7 7.1.5 USER GUIDE GAS BURNER - RESETTING If the atmospheric burner is not working: 1. Remove the protective cover. 2. Press the red button to start the burner. 7.2 BOILER ROOM • • • • Keep vents free at all times. Do not store inflammable products in the boiler room. Take care not to store corrosive products near the boiler, such as paints, solvents, chlorine, salt, soap and other cleaning products. If you smell gas, do not switch on the light or light a flame.
INTERNATIONAL ACV international n.v KERKPLEIN, 39 B-1601 RUISBROEK - belgium TEL.: +32 2 334 82 20 FAX: +32 2 378 16 49 E-MAIL: international.info@acv-world.com AUSTRALIA ESPAÑA PORTUGAL ACV PACIFIC PTY.LTD UNIT 7, 10 ANELLA AVENUE CASTLE HILL NSW 2154 - AUSTRALIA TEL.: +61 2 88 50 45 88 FAX: +61 2 88 50 45 99 E-MAIL: pacific.info@acv-world.com ACV ESPAÑA C/ANTONIO GAUDI, 3 E-08349 CABRERA DE MAR - ESPANA TEL.:+34 937 595 451 FAX:+34 937 593 498 E-MAIL: spain.info@acv-world.