Specifications

Southwestern Industries, Inc.
ProtoTRAK SMX K2, K3, K4 & Retrofit Safety, Installation, Maintenance, Service & Parts List Manual
121
6. Remove the yoke from the saddle. Disconnect the oil lines from the yoke. If the yoke is
to be re-used, it will be necessary to remove the brass nut key and pins. If the kit came with
a yoke, the original yoke may be discarded.
7. Clean the X and Y-axis gibs, oil grooves and slideways thoroughly. Also remove the
sliding covers and clean them. Inspect the operation of the oiling system.
Note: Step 7 is worth extra care, especially with machines that have some wear, or new machines that
may have some protective covering on the ways. System performance depends on smooth motion.
7.1.2 X-Axis Ball Screw Installation - Part 1
The ball screws are to be installed in the following order:
First - part of the X-axis ball screw assembly.
Second - the entire Y-axis ball screw assembly.
Third - the rest of the X-axis ball screw assembly.
Parts required:
Yoke kit 15844-xx
X-Axis drive kit 20255 -xx
X-Axis ball screw
Fi
gure 49
X-Axis Ball Screw
Note: There are wrench flats on the X and Y ballscrews for convenience.
CAUTION!
Unlike a leadscrew, never unscrew a ball screw from its nut.
This will destroy the ball screw.
8. Position the yoke in the saddle with the threaded hole on the left. Do not secure the
yoke to the saddle yet, you will need to lift the yoke to slide in the ball screw.