Instruction manual

Post-Upgrade Tests
296-1011-220 Rel. 4.1, Doc. Rev. 07.02 1-27
Upgrading to Release 4.1
Post-Upgrade Tests
Perform the following tests to verify proper operation of the CVX switch.
Verify IP connectivity between the CVX switch and other CVX switch family
devices:
-- Use the ping and traceroute commands from the CLI.
Verify that all analog and ISDN calls are successfully completing calls to the
correct VPOPs.
Verify that callers can reach the Internet.
Ensure that the MAC port count is equal to or greater than the DS0 count
enabled.
For information on configuring the CVX switch, refer to the CVX switch
documentation set available on CD-ROM, or go to the Nortel Networks online
customer support web site.