User`s manual
www.acti.com
GNR-2000 User’s Manual 1.01.04
76
Schedule
Fig. 85 Setup – Device - Schedule
You may control the recording and event handling schedule here. The one on top is the
recording schedule. The one below is the Event Handling Schedule. Recording can be either
full-time, or event only. Event responsive schedule also need to be scheduled separately.
There are some event responses that do not involve recording like access control to email.
You may:
1. Edit Recording Schedule: Click and drag over
the schedule to set time period. You need to
select Full Time or Event for that time period.
Shift-Click will set it to Full time, while
Ctrl-Click will set to Event. Right click to either
select all or clear all.
2. Edit Event Handling Schedule by clicking and dragging. Right click to either select all or