Specifications
Union School District CCTV Spec – 2014 V 2.0
Bid Proposal Due by 2:00pm Friday May 2, 2014 7
3.5 POWER
A. Provide power supplies as required at each camera location as designated on the power riser drawing.
B. All source voltage shall be conditioned to protect from environmental conditions, power surge, power
sag, under-voltage, over-voltage, line noise, frequency (variation of the waveform), transients and
harmonic distortion.
C. The circuit breakers adequate for the system load shall not draw over 80% of the rated capacity under
normal operating conditions.
D. Power quality shall be measured using a power quality analyzer.
3.6 ENVIRONMENTAL REQUIREMENTS
A. The installation site shall be completely clean and devoid of the dust and debris created during the
construction process. Operation of the equipment should not begin (even for testing purposes) until
all construction has been completed.
B. Upon completion of the work, remove excess debris, materials equipment, apparatus, tools and the
like and leave the premises clean neat and orderly.
3.7 WARRANTY
A. All security system components, Software, Hardware, and are to be fully warranted for parts and labor
for a minimum of one year from the final successful acceptance of this project. In the event any
component manufacturer warranties the item for longer than one year, the vendor will repair or
replace parts and/or labor per the warranty for the length of this warranty at no cost to the client.
Software/Firmware versions or other replaceable programming and revisions are guaranteed to be the
latest versions/revisions for this one year.
B. The vendor will contact the equipment's manufacturer one month before the warranty is to expire to
establish if a new version has become available. If newer versions become available it will be provided
and installed at no cost. If it is later determined that a new version had become available and was not
provided, the vendor will provide and install the current version at no cost no matter when the
discovery was made.
3.8 SUBMITTALS
A. Product Data: Include detailed manufacturer’s product specifications for each component specified.
Include data sheets reflecting the model numbers, features, ratings, performance, power
requirements, and dimensions
B. Shop Drawings: For the IP Video Security System equipment shall include plans, elevations, sections,
details, and attachments to other Work.
C. Include dimensioned plans and elevation views of components and enclosures. Show access and
workspace requirements. Shop drawings shall include mounting details for all racked equipment.
Such details shall include all mounting brackets, hardware, and connections to the building.
D. Wiring Diagrams: Power, signal, and control wiring point-to-point diagrams. Differentiate between
manufacturer-installed and field-installed wiring.










