User's Manual

Table Of Contents
SYSTEM DESCRIPTION AND INSTALLATION MANUAL
T
3
CAS/Part No.9005000
The maintenance pages are initiated under the following conditions:
The aircraft is On Ground
AND
The TAWS flight deck self-test pushbutton/switch is activated (again) either
during the standard self-test or within 5 seconds after the end of the standard
self test complete annunciation (“TERRAIN AWARENESS TEST
COMPLETE”).
The TAWS flight deck self-test pushbutton/switch is activated for 3 or more
seconds.
OR
The maintenance report was activated.
The maintenance pages operational flow when entered through a standard self-
test or maintenance report (past fault annunciation) is shown in Figure 5-4.
Pub. No. 8600200-001, Revision 004
34-45-29
5-15
04 Nov 2014
Use or disclosure of information on this page is subject to the restrictions in the proprietary notice of this document.