7.2 The test steps shall be performed in the order listed. In the event of a failure and repair, the test
must be performed again from the beginning.
7.3 All control settings that are altered during the course of a specific test should be returned to their
initial settings before starting a new procedure.
7.4 This procedure is intended to be performed by a knowledgeable technician or engineer. It is
assumed that the equipment will be energized and deenergized as appropriate when changing
connections and setups.
7.5 Individual column definitions are as follows:
Column
Description
Rev Ltr Revision letters are used to identify revised material.
Test No. Tests are numbered in sequence.
Opr Limits
Unit under test (UUT) shall meet these limits when tested at other than
the manufacturing facility. When an item is marked OPTIONAL, the
corresponding test is not required except as an aid in troubleshooting.
Test Description These items are the parameters to which the UUT was designed and
aid in troubleshooting by specifying the input and output signal
terminals. All conditions required are not repeated for each test, and
conditions established in previous tests also apply.
Switch Pos Positions to which switches must be set are listed in required order
and are grouped to correspond to applicable work steps.
Work Steps This column defines the operations necessary to perform a test and
achieve a result. Set switches to designated positions before
performing corresponding work step.
Mfg Limits UUT shall meet these limits at final buyoff before customer delivery.