Specifications

63
Copyright © Acronis, Inc., 2000-2010
Figure 49. Schedule Cleaning window
8.6 Backup Location Clean-up Summary
The final stage of the backup location clean-up is the summary window, where the list of
operations which will be performed is displayed.
Click Finish to save the created schedule or start the backup location clean-up task
immediately.
Figure 50. Clean-up summary