User guide
59 Copyright © Acronis International GmbH, 2002-2012
The 10 differential backups of January 31, 2012, will be stored as ServerFiles[2012-01-31]2.tib,
ServerFiles[2012-01-31]3.tib, and so on up to ServerFiles[2012-01-31]11.tib.
The following day, February 1, the backups will start with the full backup
ServerFiles[2012-02-01].tib. The differential backups will start with ServerFiles[2012-02-01]2.tib.
See also (p. 55).
4.4 Scheduling
safely protected.
The scheduling is available when creating a backup plan (p. 34) with any of the following backup
schemes: Simple, Custom or Tower of Hanoi. The schedule also can be set for validation tasks (p.
155).
The scheduler uses local time of the machine the backup plan exists on. Before creating a schedule,
Schedule
To define when a task has to be executed, you need to specify an event or multiple events. The task
will be launched as soon as any of the events occurs. The table below lists the events available under
Windows operating systems.
Event
Time: Daily, Weekly, Monthly
Time passed since the last successful backup has completed
(specify the length of time)
User logon
User logoff*
*Shutting down is not the same as logging off. The task will not run at a system
shutdown.
System startup
System shutdown
An event in Windows event log
(specify the parameters of the event)
Condition
For backup operations only, you can specify a condition or multiple conditions in addition to the
events. Once any of the events occurs, the scheduler checks the condition and runs the task if the
condition is met. With multiple conditions, all of them must be met simultaneously to enable task
execution. The table below lists the conditions available under Windows operating systems.
Condition: run the task only if