User`s guide
109  Copyright © Acronis, Inc., 2000-2010 
Edit a plan/task  Backup plan 
Click   Edit. 
Backup plan editing is performed in the same way as creation (p. 116), except for 
the following limitations: 
It is not always possible to use all scheme options, when editing a backup plan if 
the created archive is not empty (i.e. contains backups).  
1.  It is not possible to change the scheme to Grandfather-Father-Son or Tower 
of Hanoi. 
2.  If the Tower of Hanoi scheme is used, it is not possible to change the number 
of levels. 
In all other cases the scheme can be changed, and should continue to operate as 
if existing archives were created by a new scheme. For empty archives all 
changes are possible. 
Why can't I edit the backup plan? 
  The backup plan is currently running. 
Editing of the currently running backup plan is impossible. 
  Do not have the appropriate privilege 
Without the Administrator privileges on the machine, a user cannot edit 
plans owned by other users. 
  The backup plan has a centralized origin. 
Direct editing of centralized backup plans is not possible. You need to edit 
the original backup policy. 
Task 
Click   Edit. 
Why can't I edit the task? 
  Task belongs to a backup plan 
Only tasks that do not belong to a backup plan, such as a recovery task, can 
be modified by direct editing. When you need to modify a task belonging to 
a local backup plan, edit the backup plan. A task belonging to a centralized 
backup plan can be modified by editing the centralized policy that spawned 
the plan. Only the management server administrator can do so. 
  Do not have the appropriate privilege 
Without the Administrator privileges on the machine, a user cannot modify 
tasks owned by other users. 