User`s guide
192 Copyright © Acronis, Inc., 2000-2009
• Condition: Time since last backup, Time since the last backup: 12 hour(s).
• Task start conditions: Wait until the conditions are met.
As a result,
(1) if the free space changes by more than 1GB before 12 hours pass since the successful completion
of the last backup, the scheduler will wait until 12 hours pass, and then will start the task.
(2) if the free space changes by more than 1GB after 12 hours pass since the last backup successful
completion, the backup task will start immediately.
(3) if the free space never changes by more than 1GB, the task will never start. You can start the
backup manually, if need be, in the Backup plans and tasks view.