User Guide Owner's manual
89 Copyright © Acronis International GmbH, 2002-2013
Managing tasks, View task details, Summary tab, Source and Target tab
If the backup task was configured to Copy the backup to a second location then the summary tab of
the task details will consist of both the Backup task info and the Copy tack info, as shown in the
picture below.