Specifications

Chapter 6 – Mission Performance
Section B. Starting Procedures
Introduction
The following procedures must be followed before starting a cold engine.
B.1. Pre-Start
The following pre-start checks must be accomplished before the first mission
of the day and prior to engine start:
Step Action
1 Ensure hull fuel tank is full. Use fuel level gauge as required.
2 Check fuel filter sediment/water bowl for presence of
contamination. Drain sediment/water bowl as required.
3 Ensure the port and starboard cooling water intakes on the lower
engine shaft housing are free of debris.
4 Check outboard engine cover gasket for damage. Check that
outboards are secure to the transom and all mounting hardware is
tight.
5 Trim engines down until lower unit is submerged (ensure full
tilt/trim travel on each engine).
6 Ensure engine oil level is filled to ‘FULL’ mark.
7 Check hydraulic steering system for leaks at helm and at steering
ram by outboards.
8 Squeeze primer bulbs until firm.
9 Ensure the engine kill switch clips are installed and lanyards
attached.
10 Install start keys and turn key to on position. Ensure the engine
alarm system is operating.
6-5