Instruction Manual

ACR ELECTRONICS, INC / ARTEX PRODUCTS
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
C406-2 (453-5000), C406-2HM (453-5001)
25-62-11
Page 36 of 87
JUN 20/13
TEST AND FAULT ISOLATION
TASK 25-62-11-750-801
1. Inspection and Test Regulatory Requirements
SUBTASK 25-62-11-990-001
A. United States
(1) In accordance with FAR Part 91, Subpart C, ยง 91.207 (d), the ELT must be inspected within 12
calendar months after the last inspection for:
(a) Proper installation;
(b) Battery corrosion;
(c) Operation of controls and crash sensor; and
(d) The presence of a sufficient signal radiated from its antenna.
(2) All maintenance shall be performed in accordance with FAR Part 43, Appendix D, which
requires the following inspections at each annual or 100-hour inspection:
(a) ELT and mount for improper installation;
(b) Wiring and conduits for improper routing, insecure mounting, and obvious defects;
(c) Bonding and shielding for improper installation and poor condition; and
(d) Antenna, including trailing antenna, for poor condition, insecure mounting, and improper
operation.