User`s guide

Connecting the Power Cords and Powering On the 2 Gb TP9100 Tower
007-4522-003 39
Caution: Some electrical circuits could be damaged if external signal cables are
present during the grounding checks. Do not connect any signal cables to the
enclosure until you have completed the ground test
4. Connect the AC power cords to properly grounded outlets.
5. Turn the power switch on each PSU/cooling module to the “on” position (“
I”=on,
O”=off).
Checking AC Power and Storage System Status for the Tower
The “Power on” LED on the ESI/ops panel (see Figure 2-2) turns green if AC power is
present.
Figure 2-2 ESI/Ops Panel LEDs and Switches
At power-on, check ESI/ops panel LEDs for system status. Under normal conditions, the
“Power on” LED should illuminate constant green. If a problem is detected, the ESI
processor in the operator panel will illuminate the “System/ESI fault” LED in amber. See
“Solving Initial Startup Problems” on page 76 and “Using Storage System LEDs for
Troubleshooting” on page 78.
!
ID
System/ESI fault LED
Power on LED
PSU/cooling/temperature
fault LED
Alarm mute switch
1
2
3
4
5
6
7
8
9
10
11
12