User`s guide
007-4522-003 35
Chapter 2
2. Connecting to a Host and Powering On and Off
This chapter explains cabling the storage system and powering it on and off in the
following sections:
• “Connecting to a Host” on page 35
• “Grounding Issues” on page 37
• “Connecting the Power Cords and Powering On the 2 Gb TP9100 Tower” on
page 37
• “Connecting the Power Cords and Powering On the 2 Gb TP9100 Rack” on page 40
•“Powering Off” on page44
Note: For instructions on opening the rear door of the rack, see “Opening and Closing
the Rear Rack Door” on page 31.
Connecting to a Host
The 2 Gb TP9100 supports only Fibre Channel optical connectivity to the front-end host
or switch. Small form-factor pluggables (SFPs) provide the optical connection to the LRC
I/O module.
Note: Copper connections to hosts and/or switches are not supported for either RAID
or JBOD enclosures.
A pair of copper cables is packaged with 2 Gb TP9100 JBOD enclosures. These cables are
manufactured with copper SFPs on each end of the cable. Use the copper cable/SFP
assembly to connect JBOD enclosures used either as capacity expansion enclosures for a
RAID system or to connect cascaded JBOD enclosures. When the JBOD enclosure is used