Installation guide

Attaching the Power Cord
ARX-1000 Hardware Installation Guide 2 - 17
Attaching the Power Cord
Locate the power ON/OFF toggle switch on the back of the switch and
ensure it is set to the OFF position.
DANGER
In the event that AC power must be removed from the system, disconnect the
power cord before servicing the unit to avoid electric shock.
Figure 2.3 ON/OFF Power Switch (Rear View)
Powering Up the Switch
WARNING
Before applying power, ensure that the AC outlet to the switch is properly
grounded.
To power up the switch, turn the ON/OFF toggle switch(es) to the ON
position.
Cabling
You can cable the client/server ports before or after the switch is connected
to the network.
Ethernet cables are supplied by the customer. For cable specifications and
requirements, see the ARX Hardware Reference Guide.