Installation guide
Unpacking and Installing the Switch
Powering Up the Switch
5-6 ARX®1000 Hardware Installation Guide
Figure 5-3. ON/OFF Power Switch (Rear View)
See “Power Cord and Cable Requirements” on page 4-4 for power cord and cable
specifications.
Powering Up the Switch
To power up the switch, turn the ON/OFF toggle switch(es) to the ON position.
Cabling
You can cable the client/server ports before or after the switch is connected to the
network.
Ethernet cables are supplied by the customer. For cable specifications and
requirements, see “Power Cord and Cable Requirements” on page 4-4. For cable
connector and pinout information, see “Cable Connectors and Pinouts” on page 4-5.
!
WARNING
Before applying power, ensure that the AC outlet to the switch is properly grounded.