User's Guide
Table Of Contents
- Table of Contents
- 1 - Introduction
- 2 - Safety Guidelines
- 3 - Regulatory Guidelines
- 4 - Product Specifications
- 5 - Features
- 6 - Inside the Meter
- 7 - Inspecting the Site for Anomalies
- 8 - Installing the Meter
- 9 - Testing NIC Communications in the Field
- 10 - Updates and Repairs
- Index
40 A c l a r a R F E l e c t r i c I - 2 1 0 + c U s e r G u i d e
Supported Measurements
0.9.2.6.0.1.46.0.0.0.0.0.0.0.0.0.23.0
minimum fifteenMinute indicating
electricitySecondaryMetered temperature
(°C)
R2
0.9.6.6.0.1.46.0.0.0.0.0.0.0.0.0.23.0
minimum fiveMinute indicating
electricitySecondaryMetered temperature
(°C)
R2
0.8.7.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
maximum sixtyMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.8.5.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
maximum thirtyMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.8.2.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
maximum fifteenMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.8.6.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
maximum fiveMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.0.0.6.0.1.4.0.0.0.0.0.0.0.128.0.5.0
indicating electricitySecondaryMetered
current phaseA (A)
R2
0.9.7.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
minimum sixtyMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.9.5.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
minimum thirtyMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.9.2.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
minimum fifteenMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.9.6.0.0.1.4.0.0.0.0.0.0.0.128.0.5.0
minimum fiveMinute
electricitySecondaryMetered current
phaseA (A)
R2
0.2.7.6.0.1.4.0.0.0.0.0.0.0.128.0.5.0
average sixtyMinute indicating
electricitySecondaryMetered current
phaseA(A)
R2
0.2.5.6.0.1.4.0.0.0.0.0.0.0.128.0.5.0
average thirtyMinute indicating
electricitySecondaryMetered current
phaseA (A)
R2
0.2.2.6.0.1.4.0.0.0.0.0.0.0.128.0.5.0
average fifteenMinute indicating
electricitySecondaryMetered current
phaseA (A)
R2
0.2.6.6.0.1.4.0.0.0.0.0.0.0.128.0.5.0
average fiveMinute indicating
electricitySecondaryMetered current
phaseA (A)
R2
0.8.7.0.0.1.4.0.0.0.0.0.0.0.32.0.5.0
maximum sixtyMinute
electricitySecondaryMetered current
phaseC (A)
R2
0.8.5.0.0.1.4.0.0.0.0.0.0.0.32.0.5.0
maximum thirtyMinute
electricitySecondaryMetered current
phaseC (A)
R2
0.8.2.0.0.1.4.0.0.0.0.0.0.0.32.0.5.0
maximum fifteenMinute
electricitySecondaryMetered current
phaseC (A)
R2
Table 5.4
LP Measurements Supported with NIC Firmware Version 1.70
IEC 619689-6 Appenidx C Code IEC 61968-9 Description
Required
Softswitches