User's Guide
Table Of Contents
- Table of Contents
- 1 - Introduction
- 2 - Safety Guidelines
- 3 - Regulatory Guidelines
- 4 - Product Specifications
- 5 - Features
- 6 - Inside the Meter
- 7 - Inspecting the Site for Anomalies
- 8 - Installing the Meter
- 9 - Testing NIC Communications in the Field
- 10 - Updates and Repairs
- Index
Chapter 5 • Features
A c l a r a R F E l e c t r i c I - 2 1 0 + c U s e r G u i d e 35
Table 5.3
Meter Softswitch Support
Softswitch Description NIC Support
A2 Alternate communication This switch is required to
enable communication
between the NIC and the
meter module.
E2 Event log Supported
F2 Emergency Conservation
Demand (ECD)
Supported, but requires
meter reconfiguration to
modify.
J2 Demand Limiting Function Supported, but requires
meter reconfiguration to
modify.
K2 KVA and kvar measures Supported
N2 Billing demands Supported
Q2 Instrumentation
measurements
Supported
R2 Load profile recording Supported as described in
sections 5.6 and 5.3.1.
T2 Time of Use recording Supported
U2 Pre-payment metering Not supported
V2 Sag/swell event log
recording
Supported