User's Manual

2 Synergize™ RF Network GE I-210 Integration Manual
Synergize™ RF Network GE I-210 Meter Integration
Synergize™ RF Network GE I-210 Meter Integration
This document provides an overview of the material and steps required to integrate
an Aclara Synergize™ RF Network endpoint module with a new or existing GE
I-210 meter.
Components Needed
I-210 Integration
1. Put on an ESD strap.
2. Remove the meter cover.
Antenna
•Meter
Bridge
Bridge Screws
RF board
Antenna holder
Bushings/Stand-offs
Bushing/stand-off
screws
DRAFT 8-27-2015