DRAFT 101-9975T-SRFN User Manual www.Aclara.
DRAFT
DRAFT Proprietary Notice Information contained in this document is private to Aclara Technologies LLC an Ohio limited liability company (Aclara). This information may not be published, reproduced, or otherwise disseminated without the express written authorization of Aclara. Any software or firmware described in this document is furnished under a license and may be used or copied only in accordance with the terms of such license.
DRAFT
DRAFT WARNINGS, CAUTIONS, AND NOTES Always consult and adhere to all local and national safety codes, regulations, and standards.WARNING, CAUTION and Note statements are used throughout this manual to emphasize important and critical information to help you ensure safety and prevent product damage. These statements are defined below. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious physical injury.
DRAFT FCC/IC Compliance FCC/IC Compliance The following statements cover the RF exposure guide and the field calibration procedure. FCC/IC RF Exposure Guide Aclara Technologies LLC low power RF devices and their antennas must be fixed-mounted on indoor or outdoor permanent structure(s) providing a separation distance of at least 20 cm from all persons during normal operation. This device is not designed (and it has no external connection) to operate in conjunction with any other antennas or transmitters.
DRAFT Avertissements, mises en garde et remarques AVERTISSEMENTS, MISES EN GARDE ET REMARQUES Toujours consulter et respecter les codes, règlements et normes de sécurité locaux et nationaux. Des AVERTISSEMENTS, MISES EN GARDE et remarques sont utilisés tout au long de ce guide pour souligner l'information importante et critique qui vous aidera à assurer la sécurité et à prévenir les dommages au produit. Ces énoncés sont définis ci-dessous.
DRAFT Conformité FCC/IC Conformité FCC/IC Les énoncés qui suivent portent sur le guide d'exposition aux RF et la procédure de calibration sur place. Guide d'exposition aux RF FCC/IC Les appareils RF à faible puissance Aclara Technologies LLC ainsi que leurs antennes doivent être montés de manière fixe sur des structures intérieures ou extérieures permanentes qui se trouvent à au moins 20 cm des personnes pendant le fonctionnement normal.
DRAFT 9975T FINAL TEST INSTRUCTION Written by: Title: David George Test Engineer Revision History Revision A B Description Initial Release Added firmware checks Revised by D George D George Date 2015‐11‐12 2015‐11‐12 Purpose The purpose of this document is to provide instructions for testing of the 9975T transciever board during Final DCU Test and Integration.
DRAFT Test Instruction Test Instruction CAUTION: Make sure antenna cable is plugged into the DCU! This test transmits to an end point and transmitting without a load can damage the transmitter! 1. Plug the communications cable into the 4-pin connector J19 of 9975T board. 2. Make sure DCU under test has been powered for at least 2 minutes to allow 9975T time to boot up. 3. On DCU Main board verify: CPU Board has 02.40.
DRAFT Test Instruction 4. Launch the Final Test – 9975T application. 5. Select Setup, and set the correct Comm Properties. 6. Click the Get Port Names button. 7. Select the correct COM Port Name for the cable that is plugged into the 9975T board. 8. Click the Connect button. 9. Select Read Configuration, and verify communications response from the 9975T. 10. Select Set MAC Network ID and set MAC Network ID to 0. 11. Click the Configure Board button. 12.
DRAFT Test Instruction 4 13. Verify Transmit Channel frequency. 14. If all frequencies are set correctly, select Ping Test. 15.
DRAFT Customer Configuration Instruction Customer Configuration Instruction 1. Verify communications with 9975T by clicking Read Configuration, if necessary 2. Click the Configure button. 3. Select the appropriate customer .xml file. 4. Click the Open button. The program will now configure the 9975T with customer frequencies and settings. 5.
Customer Configuration Instruction 6 DRAFT 6. Click on Power Up Self Tests. 7. Verify that RTCFailCount, SecurityFailCount and NvmRWFailCount are all set at 0. 8. Verify that shipMode 1 write was successful. (It may be necessary to click twice to see shipMode write successful.) 9.