User Instructions
Final Assembly of SCG DCU
Document No.: AP-1X700-003-MAD Rev. D Page 3 of 12
Proprietary Document and Information of Aclara
Uncontrolled when printed unless marked ‘Controlled’ or ‘Production Copy’ with a date in red
2.7 Table 1 provides a list of tools and materials which are required to perform this procedure. Materials
called out here are in addition to those already included on the product bill of material (BOM).
Quantity
Description
As Req’d
Isopropyl Alcohol
1
Screwdriver, flat, 6” long x 5/16” blade or larger
1
Pneumatic Torque Driver
1
Torque Tester, Mountz M-100 or equivalent
1
3/8” Drive Socket Set
Table 1
3.0 Related Documents:
501-9975VERLT1R1-SCG-DWG, Assembly Drawing
501-9975VERST1R1-SCG-DWG, Assembly Drawing
501-9975ATTLT1R1-SCG-DWG, Assembly Drawing
501-9975ATTST1R1-SCG-DWG, Assembly Drawing
465-11700-02-PTI, Door - Switch Test Instruction