Installation Manual

LLB6327
PROGRAMMING
The MTU is programmed using the “Walkabout” programmer (P/N 501-5884A)
and programming probe (P/N 501-5884B). Programming may be performed by the meter
vendor, the meter shop, or in the field. Even if programming is performed at the factory
or meter shop, it is still necessary to use the programmer to initiate MTU operation at the
time of field installation. Refer to the “Walkabout” manual for programming
information.