Installation Instructions

Table Of Contents
MTU Instruction
for Armor Access Rubber Pit Lids
Purpose & Scope
This instruction provides a procedure for mounting a STAR Flatpak MTU to an Armor
Access brand rubber composite pit lid. This procedure covers the mounting of an
Original Flatpak STAR MTU or the New Flatpak STAR MTU to these pit lids. This
procedure does not detail the wiring of the MTU to the meter that may be encountered
inside of the pit. Please refer to Publication 471-2000, General Installation and Wiring
Guidelines in addition to any meter specific MTU installation and programming instructions.
Parts Required
Item Part Number Quantity
MTU As required for installed
meter
1
Long Spacers (for pit lid mounting of New Style Flatpak
MTUs)
056-8150L
2 per New
Style MTU
installation
#10 x 2 1/2” Phillips Pan Head Type AB Stainless Steel
Sheet Metal Screw
2 per New
Style MTU
installation
#10 x 2” Phillips Truss Head Type AB Stainless Steel
Sheet Metal Screw
2 per Original
Style MTU
installation
Tools Required
To mount the MTU to these Armor
Access pit lids, you will need the following
tools and equipment:
Safety goggles
#3 Phillips driver bit
Cordless Drill 3/8”, variable speed,
with adjustable torque settings.
Note on setting the torque range: On a
drill-driver that has about 20 settings
(positions), set the adjustment to #6. Use
the lower speed range of the drill-driver.
This should amount to approximately 8 in-
lbs of torque. Reference the operating
instructions for your particular drill to
more accurately determine what setting to
use to achieve a torque range of
approximately 8 in-lbs.
471-2006 - 11/6/2006
Page 37