Technical information

- 26 -
1. [USE 1*PCS SCREW(M3.5*8-B) TO FIX
POWER/B AT THE APPOINTED PLACE]
2.[GET POWER/B MYLAR AND STICK ON
THE APPOINTED PLACE]
3. [GET BUTTON CABLE THROUGH THE
APPOINTED HOLE]
1. [MOVE PCB SHIELD TO THE FRONT OF
CONVEYER]
2. [GET PANEL AND PUT IT ON THE
CONVEYER, THEN TEAR OFF THE
INCOMING TAPE]