User Guide
© 2003, Adaptec, Inc. 195
1 In the navigation area right-click the BBU -> Recondition or select BBU -> Recondition Battery.
2 An information dialog box opens confirming that the battery is now being reconditioned and to check the Task
Monitor to view the status.
Figure 107 Reconditioning a Battery Information Dialog Box
3Click OK.
4 Open the Task Monitor to view the status of the recondition. See 6.8 Monitoring Long Operation Tasks on page 128
for more information about the Task Monitor.
7.10 Shutting Down a Controller
The purpose of this activity is to cleanly prepare to shut down the controller system, leaving the BBU charged. In a
duplex controller environment, both controllers are prepared for shutdown. Shutdown disables the controller cache and
saves all data to physical drives prior to disconnecting the BBU.