Operation Manual

27
Initial steps before testing
2
Insert a new test strip drum in the meter as illustrated (the two rows
of bar code must be nearest the display window).
Close the drum compartment cover and push it shut. There will be
an audible CLICK.
The meter turns on and rotates the test strip drum until the first test
strip is in the correct position. At the same time the meter reads the bar
code that provides it with information on the specific characteristics of
the test strips. After that, the meter turns off.
AC_CP_LCM_Manual_EN-UK final.indd 27_CP_LCM_Manual_EN-UK final.indd 27 20.6.2007 11:04:0020.6.2007 11:04:00