User's Manual

ODU CPE for BreezeACCESS VL Quick Installation Guide
2
P/N: October 2006
1. Thread the provided metal band through the adaptor bracket and use the screws provided with the mounting kit to attach
the adaptor bracket to the unit.
2. Connect a grounding cable between the Ground terminal of the ODU (marked ) and a good ground connection.
3. Align the unit using the LED display.
Preparing the IDU-ODU Cable
Use a crimp tool for RJ-45 connectors to prepare the wires. Insert them into the appropriate pins and use the tool to crimp the
connector. Make sure to do the following:
Remove as small a length as possible of the external jacket. Verify that the external jacket is well inside the sealing
cover when connected to the unit, to ensure good sealing.
Pull back the shield drain wire before inserting the cable into the RJ-45 connector, to ensure a good connection with
the connector's shield after crimping.
The following diagram shows the required wire pair pin-to-pin connections,
including the color codes used in cables supplied by the manufacturer.
Wire color Pin
Blue 1
Blue/white 2
Orange 3
Orange/white 6
Brown 4
Brown/white 5
Green 7
Green/white 8
Connecting the IDU-ODU Cable
1. Remove the sealing cap of the ODU connector.
2. The sealing cap has a special groove allowing to insert an Ethernet cable with an already assembled RJ-45 connector
through the cap. To expose the groove, lightly squeeze the cap. Carefully insert the cable with the assembled connector
through the groove.
12345678
1 + 2
4 + 5
7 + 8
3 + 6