Specifications

VE106 Groove-N-Go Tool 17
6. Insert a length of pipe/tubing that is the
correct size and thickness onto the lower roll.
7. Make sure the pipe/tubing end contacts
the lower-roll backstop flange completely.
8. Rotate the feed screw clockwise to
bring the upper roll into firm contact with the
pipe/tubing. Continue to support the pipe, or
use a pipe stand for long pipe/tubing lengths.
Refer to the "Long Pipe/Tubing Lengths" sec-
tion on page 11.
9. Remove hands from the pipe/tubing.
10. For long pipe/tubing lengths supported
with a pipe stand, make sure the pipe/tubing
is pitched and positioned properly. Refer to
the "Long Pipe/Tubing Lengths" section on
page 11.
Lower Roll
Backstop
Flange
Pipe
TM-VE106 3736 Rev_B.fm Page 17 Monday, May 9, 2005 12:02 PM