Specifications

VE106 Groove-N-Go Tool 11
of pipe. Refer to the “Long Pipe/Tubing
Lengths” section on this page.
LONG PIPE/TUBING
LENGTHS
When roll grooving pipe/tubing that exceeds
the maximum length shown in Table 1, a roll-
er-type pipe stand must be used. The roller-
type pipe stand must be capable of handling
the weight of the pipe/tubing, while allowing
the pipe/tubing to rotate freely.
a. Make sure the tool is level. Refer to the
"Tool Setup" section on page 6 for leveling
requirements. Set the pipe stand height to
produce a
1
/
2
– 1° pitch on the pipe away from
the tool (see Figure 1). This will help promote
tracking and reduce pipe end flare.
b. When flare is excessive, right-to-left
tracking must be kept to a minimum. It may be
necessary to use less than
1
/
2
º for the tracking
angle (see Figure 2).
c. Installation of couplings on pipe/tubing
that exceeds the maximum allowable flare
may prevent pad-to-pad closure of the hous-
ings and/or may cause damage to the
coupling gasket. Refer to the applicable “Roll
Groove Specifications” table for details.
d. If the tool is properly set up in a level
position, but the back end of the pipe/tubing
is higher than the end being grooved, the
pipe/tubing may not track. As a result, exces-
sive flare may occur on the pipe/tubing end.
Refer to the "Tool Setup" section, starting on
page 6, and Figures 1 and 2 for tool setup and
pipe/tubing positioning requirements.
e. Position the pipe stand at a distance
slightly beyond half the pipe/tubing length
from the tool. Refer to Figure 1 below.
Figure 1 - SUPPORT OF PIPE
f. Position the pipe stand approximately 0
to
1
/
2
º to the left for the tracking angle. Refer to
Figure 2 below.
Figure 2 - TRACKING ANGLE
NOTICE
Figure 1 shows a typical pipe stand
Victaulic offers several pipe stands, such as the
VAPS112 and VAPS224. The VAPS112 is suitable for
3
/
4
– 12-inch sizes. The VAPS224 is suitable for 2– 24-
inch sizes. Refer to the "Accessories" section on
page 25.
For additional information about the pipe stands,
refer to the Operating and Maintenance Instructions
Manual included with the pipe stand.
Tool
Centerline
(Level)
¹⁄₂° to 1°
2 to 4 inches
(50 to 100 mm)
Pipe
Centerline
20-foot (6-meter)
Length of Pipe
Pipe Angle
Exaggerated for
Clarity
10 ft + 1 ft - 0
(3m + 0,3m - 0)
Tool
Centerline
0° to ¹⁄₂° Max.
0-inches to 2-inches Max.
(0-mm to 50-mm Max.)
Pipe
Centerline
20-foot (6-meter)
Length of Pipe
Pipe Angle
Exaggerated for
Clarity
TM-VE106 3736 Rev_B.fm Page 11 Monday, May 9, 2005 12:02 PM