Replacement Part List
Accentua
Vinyl Square Cupola Installation
 Step 1: Use 2 pieces of wood each ~ 
24 in. long (2x4s are ideal). Fasten 
together with one screw, just loose 
enough that boards can still pivot 
with pressure.
Step 2: Measure overall length of 
roof; find center and mark.          
Step 3: Lay your boards over the 
peak of the roof, making sure each 
board is fully against the surface. 
Mark boards with pencil to confirm 
angle position. Mark front & back of 
roof (not all roofs are symmetrical.) 
Step 4: Now working on the ground, 
measure to identify center of cupola 
base and mark lightly with a pencil.
Step 5: Place louvered midsection 
upside down on a smooth flat 
surface. Place the flared base section 
upside down (widest portion up) on 
top of the midsection.
Step 6: Ensure that the base section 
is centered on the midsection, and 
connect with 1-1/4 in. screws in 
each pre-drilled hole.
Step 7: Use pattern to mark cut lines 
that match your roof profile. Cut lines 
should extend from each lower 
corner to your center line drawn in 
step 4.
Step 8: Cut out roof profile by 
starting at corners of cupola base 
and cutting to the center. Repeat 
steps 4 - 6 on the opposite side of 
your cupola base. (If your roof is not 
symmetrical, make sure that your 
lines / cuts match the angles needed 
for the front and back roofs.)
Step 9: Position cupola on center of 
roof and fasten with 3" white 
headed screws. Note: if you want 
to utilize venting, cut a hole (app. 
8" square) in the roof prior to 
fastening cupola. Attach screen 
mesh over hole to keep bugs out.)
Congratulations on completing
the installation!
Step 10: Place cupola roof on top of 
base. Note: Remove shrink wrap 
from copper after Step 9 is done, to 
protect copper from oils on skin.
Step 11: Attach roof to base using 1-
3/4 in. white headed screws supplied 
with unit.
Note: your cupola may vary in size 
from the pictures or include a 
different type of midsection (e.g. 
have windows or a different 
number of slats.) The same 
installation practices apply.

