User manual
Step 18 - Attach 2 pin connectors
Cut off power supply plug, strip wires back and attach 2 pin connector.
Attach 2 pin connectors to phase "A" and "B" CTs cable ends.
Step 19 - Install Current Transformers
Install the current transformers around incoming power wires.
Label one wire phase "A" and the other Phase "B".
WARNING:
Be Very Careful while working inside the energized load center.
Electrical shock can occur and could be deadly.
Proper electrical personal protective equipment must be worn.
Step 20 - Connect 2 pin signal connectors to HEM PCB
Plug the 2 pin VAC transformer cable into the VAC connector.
Plug the 2 pin CT cable for Phase "A" into the A connector.
Plug the 2 pin CT cable for Phase "B" into the B connector.










