Installation Guide

PAGE 8
ABSCO INDUSTRIES ASSEMBLY INSTRUCTION - MODEL: J30232G 14/08/14 CUSTOMER SUPPORT - 800-305-4436
STAGE 1: PUSH RIDGE BEAMS TOGETHER, MAKE SURE THERE IS A 2in OVERLAP
OF THE RIDGE CAP
STAGE 2: INSERT RIDGE CAP JOINER INTO CONNECTED RIDGE CAPS.
MAKE SURE JOINER HAS 8-55/64in IN EACH RIDGE CAP.

PLACE TEK SCREWS IN 2in INCREMENTS FROM SAID END.
REPEAT THIS PROCESS FOR THE OPPOSING HALF OF RIDGE BEAM
INSTRUCTIONS FOR JOINING SPLICED RIDGE BEAM
2"
8-55⁄64in
2in
2"
Premier Garden Shed
- Model: J30232G
INSTRUCTIONAL
VIDEOS