Use Manual

Table Of Contents
Shut down the GLP systems Track
Prerequisite Verify that no additional samples are being distributed.
Perform this procedure to shut down the GLP systems Track.
1. Leave the Track Sample Manager (TSM) and the storage on the Archive II powered on.
2. Use the On/Off push buttons to power off the modules.
3. Verify that all CARs are located in the charge lanes and are being charged.
NOTE: The individual modules are powered off. The computer on which TSM is installed
and the storage on the Archive II should remain powered on.
Related information...
Operating instructions, page 91
Section 5
Operating instructions
Shut down the GLP systems Track
GLP systems Track Operations Manual
80003968-101 - 2021-09-16
93