Product specifications
OPC Diagnostic Tag S+ P13 OPC BUILDER
2VAA001153C 83
In order to shutdown the SPlus Operations during OPC Communication failure, Configure the Task monitor as shown below:
Figure 5-7: Process Monitor
In System Tray, Right on PWMONITOR and Select Process Monitor > Configurator. Click on Settings and Select Tag
Configuration from drop down menu.
In the Process Monitor Configuration add OPC Diagnostic Tag under Alarmed Tags to Monitor. Click on the Settings and
Go to General Configuration to c
Figure 5-8: Adding OPC Diagnostic Tag in the Process Monitor
After configuring OPC Diagnostic Tag in the Process Monitor, whenever OPC communication fails between S+ Operations and
Procontrol P13 OPC Server, SPlus will be stopped.
1
2
3
4
1
2
3
4