Installation manual

193
SMA
SMA Meter Connection Box
66�5 SMA Meter Connection Box
An energy meter with S0 output can be connected to the SMA Meter Connection Box. The Meter
Connection Box then converts the S0 signal to the RS485 Bus.
The Meter Connection Box is connected to the RS485 socket the same way as with the SMA inverter.
In the course of the inverter detection, the Box is recognized as an inverter - SMA is to be selected.
The configuration is done in the Configuration|Devices|Configuration menu.
Procedure
•
Perform detection.
•
Select the respective number.
•
Enter the generator power.
•
Enter the pulse factor.
•
Select the type of power meter.
•
Save.