Installation Manual

Electrical installation
31
7
Electrical installation
7.1
General electrical installation procedure
Preliminary requirements
Procedure
1.
Install the AC input cable.
Insert the AC input cable. Refer to section 7.2.
Connect the AC input cable. Refer to section 7.3.
2.
Install the Ethernet cable.
Insert the Ethernet cable. Refer to section 7.4.1.
Connect the Ethernet cable. Refer to section 7.4.2.
3.
If necessary, install the cables for smart meter communication.
Insert the cables for smart meter communication. Refer to section 7.4.3.
Connect the cables for smart meter communication. Refer to section 7.4.4.
4.
If you want to use the internet, insert the Nano-M2M SIM card. Refer to section
7.4.5.
5.
If necessary, replace the EV charge cable. Refer to section 7.5.
7.2
Insert the AC input cable
7.2.1
Install the cold-pressed terminal for PE
Preliminary requirements
Crimping Tool
AC input cable (1 phase)
Cold-pressed terminal for
PE.
Refer to section 10.6.
Procedure
1.
Strip the wires. For the
specification, refer to section
10.12.1.
2.
Insert the cable into the cold-
pressed terminal to its full
insertion length. Crimp the
cold-pressed terminal with the
correct jaws.
3.
Finished.