Installation Manual
Electrical installation
31
•
7
Electrical installation
7.1
General electrical installation procedure
Preliminary requirements
Procedure
1.
Install the AC input cable.
•
Insert the AC input cable. Refer to section 7.2.
•
Connect the AC input cable. Refer to section 7.3.
2.
Install the Ethernet cable.
•
Insert the Ethernet cable. Refer to section 7.4.1.
•
Connect the Ethernet cable. Refer to section 7.4.2.
3.
If necessary, install the cables for smart meter communication.
•
Insert the cables for smart meter communication. Refer to section 7.4.3.
•
Connect the cables for smart meter communication. Refer to section 7.4.4.
4.
If you want to use the internet, insert the Nano-M2M SIM card. Refer to section
7.4.5.
5.
If necessary, replace the EV charge cable. Refer to section 7.5.
7.2
Insert the AC input cable
7.2.1
Install the cold-pressed terminal for PE
Preliminary requirements
•
Crimping Tool
•
AC input cable (1 phase)
•
Cold-pressed terminal for
PE.
Refer to section 10.6.
•
Procedure
1.
Strip the wires. For the
specification, refer to section
10.12.1.
2.
Insert the cable into the cold-
pressed terminal to its full
insertion length. Crimp the
cold-pressed terminal with the
correct jaws.
3.
Finished.