Specifications

Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Maintenance 01/2011 Page 443
Connect the mains cable. Connect one end of the mains cable to the main cabinet and the
other end to a grounded mains power point.
Attention : The iPBX must be powered off when installing
the mains cable.
Never connect network lines while the mains
power cable is unplugged.
Power on the iPBX. Before powering on the cabinet, check that all the following tasks
have been performed:
- all line connections are installed,
- all equipment has been connected to a grounded power point.
Power on the iPBX:
- or an iPBX with several cabinets, first power on the expansion
cabinet by setting the
“I/O” switch on the power supply module set to “I”.
- Set the “I/O” switch on the main cabinet power supply module to
position “I”.
Check the status of the indicators (see Sections 4.6).
Check the UCV card's
system and application
software releases using
the AMP.
Refer to the document Aastra Management Portal AXD-AXL-AXS-
AXS12-A5000 Server – Operating Manual.
Restore the data of the
old configuration.
Refer to the document Aastra Management Portal AXD-AXL-
AXS-AXS12-A5000 Server – Operating Manual.
Table 20:
OPERATION DETAILS OF THE OPERATION / COMMENTS