Specifications

Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Maintenance 01/2011 Page 441
SHEET E-13STANDARD REPLACEMENT OF AN AXS MAIN CABINET
AVAILABILITY
No mission capable
1 operator on site
DURATION
30 minutes
1 Facom AZXR 10*75 Torx screwdriver for M3 screw (card).
1 Facom AZXR 15*75 Torx screwdriver for M4 screw (cover).
INGRÉDIENT(S)/CONSOMMABLE(S)
•N/A
Table 20:
OPERATION DETAILS OF THE OPERATION / COMMENTS
Back up the customer
configuration.
Precautionary operation to be carried out if there is no existing
copy (which is the case when previous installation operations
have been carried out and the procedures followed).
Refer to [1]
In the case of remote operation, contact the remote operator
before starting any operation.
Power off the iPBX. Refer to Section 6.4, Stopping the system (AXD, AXL, AXS,
AXS12 and AXS6)Error! No bookmark name given.
For a system with several cabinets, first power off the main
cabinet, then the expansion cabinet.
Nota : It is advisable to stop the IPS card before powering off the
iPBX.
Disconnect the external
cables.
Disconnect the mains cable.
Disconnect the cables from the front panel of the UCV card and
those on the cabinet's expansion cards and mark the cables for
refitting.
For a system with several cabinets, disconnect the cable located
at the rear of the cabinet.
Remove the cover from
the old cabinet.
Unscrew the two securing screws of the upper cover, at the back
of the cabinet.
Remove the upper cover by sliding it backwards.
Remove the old cabinet.
Remove the expansion
cards.
Unlock the cards (see Figure 4.1 ) and pull them out from the
backplane.