Specifications

Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Maintenance 01/2011 Page 425
Table 12:
OPERATION DETAILS OF THE OPERATION / COMMENTS
Check the compliance of
the new fuses.
See Tableau 7.5 .
Insert the new fuses in the
fuse holder.
Refit the fuse holder in its
slot, on the front panel of
the power supply module.
Connect the cables. Disconnect the mains cable, and if appropriate the backup
battery connector:
- on the front panel of the power supply module (AXL)
- at the back of the cabinet (AXS and AXS12).
Power on the iPBX. If it is an iPBX with multiple cabinets, first power on the power
supply module for the expansion cabinets ("I/O" switch on "I").
Power on the power supply module of the main cabinet (“I/O”
switch on “I”).
Check the status of the
indicators on the front
panel.
Refer to Section 4, Description des sous-ensemblesError! No
bookmark name given.